Vector Utility Engineering Ltd was engaged to support a constituent of the FTSE 250 in undertaking a comprehensive review of its existing NERS policies and procedures across its UK network of businesses.
 

Our scope encompassed the review, recommendation, and implementation of a consolidated framework, bringing together ESM Power Ltd and G2 Energy Ltd—alongside the future integration of Rock Power Connections Ltd—into a unified suite of best-practice procedures.

This framework was designed to support all permitted contestable activity scopes, including the design, project management, and construction of electricity networks up to and including 132kV.

Throughout the project, we maintained close and structured consultation with all key stakeholders.

This included working collaboratively with Mitie’s senior management team, the directors of each respective business, and LRQA’s lead auditing team. This ensured full alignment with Mitie’s strategic vision and values, as well as compliance with the requirements of the NERS accreditation scheme.

 

Despite a highly demanding timeline, the project was successfully delivered in under three months from appointment. By proactively anticipating challenges and maintaining a focused delivery approach, we exceeded client expectations and received exceptionally positive feedback.

Project Mercury

ChatGPT Image Mar 24, 2026, 11_52_56 AM.png

Full Suite for Aaron HV

Vector Utility Engineering Ltd is pleased to be supporting Aaron HV Systems Ltd, part of the Aaron Engineering Group, through the development and implementation of a comprehensive NERS Safety Management Suite.

 

This framework has been designed to support contestable design, construction, and project management activities on electricity networks up to and including 132kV.

Working in close collaboration with Aaron’s senior leadership team, we have established a fully compliant NERS safety management system, this includes the development of generic risk assessments, method statements, policies and procedures, COSHH assessments, and a suite of supporting framework templates.

 

All documentation has been carefully aligned with the wider group’s ethos and operational values.

 

This integrated approach ensures that Aaron HV Systems Ltd is well-positioned to operate effectively and compliantly within the contestable market.

ChatGPT Image Mar 24, 2026, 11_56_23 AM.png

Vector Utility Engineering Ltd was appointed by a valued client to develop a comprehensive Bill of Quantities (BoQ) for a 2MVA high-voltage (HV) connection.

This connection was required to facilitate the installation of multiple Tesla Superchargers at a prominent visitor centre in Cumbria.

 

Our scope involved the preparation of a detailed and structured BoQ, encompassing all elements of the proposed works.

This included civil excavations, permitting requirements, labour allocation, and material resourcing. Each component was carefully quantified and aligned with project specifications to ensure accuracy and clarity.

 

The completed BoQ provided the client with a robust foundation to support their tendering process, enabling informed decision-making and effective cost management across the project lifecycle.

Supercharging the future

ChatGPT Image Mar 24, 2026, 12_05_16 PM.png

Civils Expertise

Vector Utility Engineering Ltd has been appointed by Avara Civils Ltd to develop and implement a comprehensive NERS Safety Management Suite.

 

This framework supports contestable civil construction and project management activities on electricity networks up to and including 33kV.

Our scope includes the establishment of a fully compliant NERS safety management system, incorporating generic risk assessments, method statements, policies and procedures, COSHH assessments, and a suite of supporting framework templates.

 

All documentation has been developed in accordance with NERS requirements and tailored to align with Avara Civils Ltd’s operational needs.

Following the successful achievement of partial accreditation, we continue to support Avara Civils Ltd through the provision of technical support services.

 

This ongoing partnership is focused on strengthening their operational capability and supporting the development of a strong and credible presence within the industry.

ChatGPT Image Mar 24, 2026, 12_10_11 PM.png

Vector Utility Engineering Ltd is delighted to be supporting Energyforce Ltd through the provision of our Project Overflow Support package, delivering both technical and project management expertise across their expanding portfolio.

Our scope includes the provision of NERS-qualified supervisory resource for both electrical and civil activities, alongside dedicated project management support to assist in the delivery of their growing workload.

This support underpins Energyforce Ltd’s continued rollout of electric vehicle (EV) charging infrastructure across dealerships and showrooms throughout the UK. By integrating seamlessly with their existing teams, we are helping to ensure projects are delivered efficiently, safely, and in line with industry standards.

We look forward to continuing our partnership with Energyforce Ltd as they drive forward this significant programme of sustainable infrastructure development.

Supporting fellow ICPs

ChatGPT Image Mar 24, 2026, 12_19_04 PM.png

NERS for NETS

NETS International is a global telecommunications and IT solutions provider, operating across four continents with an extensive and established fibre network portfolio.

Vector Utility Engineering Ltd is pleased to have been appointed to support NETS International’s expansion into electricity distribution networks.

As part of this engagement, we have developed and implemented a comprehensive framework of procedural safety systems, designed to integrate seamlessly into their wider group management system.

 

This has enabled NETS International to work towards achieving NERS accreditation.

We are proud to continue supporting their growth through the provision of technical expertise, assessment services, and design support as their capabilities evolve within the energy sector.

ChatGPT Image Apr 7, 2026, 11_34_36 AM.png

The rEVolution Begins

We’re pleased to have successfully completed the contestable scope of works to facilitate the connection of four new 160kW EV charge points at a new high-end retail unit in Speke.

Through close collaboration with our client, we delivered a simple yet effective design solution, ensuring compliance with all stakeholders and allowing the project to progress with full confidence.

Our works on site were audited by LRQA and included the installation and termination of IDNO-adopted waveform cable into a 400A combined CTCO, along with the required pre-energisation testing ahead of connection to the existing local distribution network.

IMG_5400.JPG

Vector Utility Engineering Ltd has been appointed by our client to deliver the full HV and LV design package for a 350kVA EVC supply in Cornwall. Working closely with National Grid Electricity Distribution, our nominated IDNO, and the client team, we have demonstrated both pragmatism and versatility throughout the project.

Our scope has included the development of substation GA drawings for bespoke switchgear, completion of a desktop network earthing study, preparation of network single line diagrams, and identification of the most efficient cable route to supply power to the development from an existing overhead line located approximately 300m away.

Cornwall's EV Drive

Screenshot 2026-05-14 104224.png

Contact Us

0330 043 4538

Suite 214A, Davyfield Road, Blackburn, BB1 2QY

© 2026 by Vector Utility Engineering Ltd. All rights reserved.

ChatGPT Image Mar 10, 2026, 12_23_42 PM.png
bottom of page